ADU Rules in the City of Stockton
The City of Stockton offers three free pre-approved ADU plans (studio, 1-bedroom, and 2-bedroom, each with one bath and electric-only service). Each project still needs a site-specific site plan, a building permit, and Planning approval for zoning.
This page covers the City of Stockton, California only. If your parcel is in unincorporated San Joaquin County or another city, different local rules apply. State law (Gov. Code §66310 et seq.) sets the floor; verify with the city before you design or build.
HomeBuyers Alliance is a 501(c)(3) nonprofit. We make no contractor referrals, don’t endorse builders or plan vendors, and don’t sell plans. This guide is education only, not legal advice.
The short answer
The City of Stockton offers three free, city-provided pre-approved ADU plans: a studio, a 1-bedroom, and a 2-bedroom, each with one bathroom. You still need a site plan, a building permit application, and Planning approval to confirm zoning compliance. Pre-approved plans aren’t an option on lots in a FEMA Special Flood Hazard Area.
For the statewide rules every California city must follow, start with our California ADU guide and the 2027 California ADU law roundup.
Is your lot in the City of Stockton?
A Stockton mailing address doesn’t always mean your parcel is inside city limits. Confirm with the City of Stockton that your parcel is inside city limits before you pick a plan. Unincorporated areas around Stockton are under San Joaquin County. If your parcel turns out to be outside the city, the rest of this page won’t apply to you.
City of Stockton vs. San Joaquin County
Unincorporated San Joaquin County has its own rules. The county’s Planning Division FAQ says one ADU and one JADU may be permitted on any lot in any zone that permits single-family homes, subject to county Development Title Section 9-409.010. For a nearby city, see our City of Sacramento ADU page.
What the city’s ADU page says
The city’s Accessory and Junior Accessory Dwelling Units page says:
- Pre-approved plans are meant to speed up permit approval and reduce plan review costs, as AB 1332 requires.
- Pre-approved projects still need site-specific design and permitting approval like any standard project, plus Planning Department approval for zoning.
- Pre-approved plans are not available for properties in a FEMA Special Flood Hazard Area on the current flood map.
- A fire sprinkler system will be required if the original house has sprinklers.
- Unpermitted ADUs endanger health and safety, the city says, and owners must get permits that meet California building, mechanical, electrical, plumbing, and fire codes.
For custom designs, the city points applicants to its ADU/JADU Plan Review Submittal Checklist (BLDG-0103). For pre-approved plans, it points to its Pre-Approved ADU Checklist and Sample Site Plan (BLDG-0079), both on the city’s Building Forms page.
Pre-approved and permit-ready plans
Since January 1, 2025, California law (Gov. Code §65852.27, from AB 1332) has required cities and counties to have a process for preapproving ADU plans. Stockton says its city-offered plans are free of charge for community members building within city limits. You can choose a studio, 1-bedroom, or 2-bedroom, all with one bath. The city says all three are electric-only to meet current energy code. To use one, you submit a completed permit application and a scaled site plan showing setbacks and easements.
The city also has a path for vendors to get plans pre-approved. If you use a vendor plan, the city requires site-specific energy forms and the vendor’s written permission on letterhead. The city says it doesn’t specially authorize or recommend plan designers.
Pre-approved plans save design and review time, but they don’t remove site work. You still need a site plan, utility planning, and any reports your lot requires. Our guide to pre-approved ADU plans in California explains what “pre-approved” does and doesn’t cover. If you want to sort through your options first, the free ADU planner can help you organize questions before you call the city.
Fees: what to expect (without guessing numbers)
Stockton’s ADU page doesn’t list ADU fee amounts. It says pre-approved plans are meant to reduce the normal plan review cost. For current fees, ask the city’s Building & Life Safety division through the ADU page.
Common fee types on a California ADU include:
- Plan check and building permit fees, charged by the city for review and inspections.
- School fees, charged by the school district, not the city.
- Utility and connection charges, which depend on your water, sewer, and electric providers.
- Development impact fees. State law (Gov. Code §66324) bars impact fees on ADUs under 750 square feet. ADUs of 750 square feet or more can be charged proportionately to the main home’s size.
We don’t publish fee amounts we haven’t confirmed on an official schedule. Ask the city for a current estimate for your exact project. For more background, see ADU impact fees in California.
How long the permit takes
State law (Gov. Code §66317) gives a city 15 business days to tell you whether a submitted ADU application is complete, and 60 days from a complete application to approve or deny it. Those are backstops, not promises about your project. We didn’t find a Stockton-specific ADU review time on the city’s ADU page. Corrections, missing documents, and outside-agency reviews can all add time. See our ADU permit timeline guide for how the clock works.
What does an ADU cost in Stockton?
We don’t have Stockton-specific construction cost data from an official or verified source, so we won’t publish a number. Costs depend on size, site conditions, utilities, design, and contractor pricing. Get several written bids and compare them line by line. Our California ADU cost breakdown explains the main cost categories.
If you’ve seen references to the CalHFA ADU Grant, note that it is a past program. Its funds were used up, and it isn’t accepting applications.
Frequently asked questions
Can I build a JADU in Stockton?
State law allows a JADU of up to 500 square feet within a single-family home. Use the city’s ADU/JADU submittal checklist and confirm current requirements with the city.
Do I have to live on the property?
State law requires owner occupancy for a JADU (in either the main home or the JADU). For an ADU without a JADU, state law generally doesn’t allow owner-occupancy requirements. Confirm with the city.
Can I use SB 9 instead?
SB 9 lot splits and two-unit projects are a separate state law from ADU rules, with different eligibility tests. Compare the two in our SB 9 vs. ADU guide, then confirm with the city.
Can I sell the ADU separately?
Only if the local government has opted in to a program under AB 1033 and your project meets its requirements. We didn’t find a Stockton AB 1033 program on the city’s ADU page. Check our guide to selling an ADU separately and ask the city directly. Don’t assume it’s allowed.
Rules change, and every lot is different. Confirm current requirements with the City of Stockton before you design, buy, or build. When you’re ready to map out your project, try the free ADU planner.