ADU Rules in the City of Anaheim
The City of Anaheim reviews most ADUs and JADUs through its standard building permit process. It also posts pre-approved plans and runs ADU Express, an accelerated review for certain qualified single-family lots using a pre-approved detached ADU plan.
This page covers the City of Anaheim, California only. If your parcel is in unincorporated Orange County or another city, different local rules apply. State law (Gov. Code §66310 et seq.) sets the floor; verify with the city before you design or build.
HomeBuyers Alliance is a 501(c)(3) nonprofit. We make no contractor referrals, don’t endorse builders or plan vendors, and don’t sell plans. This guide is education only, not legal advice.
The short answer
Most ADUs and JADUs in the City of Anaheim go through the city’s standard building permit review. The city also posts pre-approved ADU plans and runs ADU Express, a faster review for certain qualified single-family properties that use a pre-approved detached design. Eligibility depends on your lot, so check before you plan around it.
For the statewide rules every California city must follow, start with our California ADU guide and the 2027 California ADU law roundup.
Is your lot in the City of Anaheim?
An Anaheim mailing address doesn’t always mean your parcel is inside city limits. Check your address with the City of Anaheim before you start. Anaheim’s ADU Express page includes an eligibility tool you search by address, and the city’s ADU team takes questions at ADUAnaheim@anaheim.net. If your parcel turns out to be outside the city, the rest of this page won’t apply to you.
City of Anaheim vs. Orange County
Unincorporated Orange County is handled by OC Development Services, not by any city. The county posts its own pre-approved ADU plans page. Nearby cities each set their own local standards within state law: see our pages for Santa Ana, Irvine, and Laguna Niguel.
What the city’s ADU page says
The city’s ADU Anaheim page says:
- Anaheim’s ADU and JADU rules are in Anaheim Municipal Code Section 18.38.015.
- A JADU must be built within an existing single-family home, and JADUs require a deed restriction for owner-occupancy.
- Most ADUs and JADUs go through the standard building review process, with plans prepared by a licensed architect, engineer, or designer.
- The city says ADU Express lets qualified single-family properties complete ADU review “within 1-3 days.” That’s the city’s description of the review step for eligible lots. It isn’t a promise for every project, and it doesn’t cover construction.
The city’s ADU submittal checklist also lists steps to complete before plan check. These include written sewer-capacity verification from Public Works, a meter spot report from Anaheim Public Utilities if you’re adding or changing an electric meter, and a new address request.
Pre-approved and permit-ready plans
Since January 1, 2025, California law (Gov. Code §65852.27, from AB 1332) has required cities and counties to have a process for preapproving ADU plans. Anaheim posts a Pre-Approved Plan Catalogue. The city says some pre-approved plans may still need a design professional to finish the submittal, such as a site plan, Title 24 energy documents, structural details, or a soils report. Each plan notes what else it requires.
ADU Express uses the pre-approved detached plans. Per the city, the steps are: check eligibility by address, pick a plan, then contact city staff. The city asks applicants to schedule a meter spot with Anaheim Public Utilities first. Only certain qualified single-family properties are eligible.
Pre-approved plans save design and review time, but they don’t remove site work. You still need a site plan, utility planning, and any reports your lot requires. Our guide to pre-approved ADU plans in California explains what “pre-approved” does and doesn’t cover. If you want to sort through your options first, the free ADU planner can help you organize questions before you call the city.
Fees: what to expect (without guessing numbers)
Anaheim’s ADU Express page says the Building Division gives you information on applicable development impact and school district fees after your in-person meeting, and that all fees must be paid before the building permit is issued. The city notes that Anaheim is served by several school districts, so the district you pay depends on your address. For current permit fees, contact the Building Division.
Common fee types on a California ADU include:
- Plan check and building permit fees, charged by the city for review and inspections.
- School fees, charged by the school district, not the city.
- Utility and connection charges, which depend on your water, sewer, and electric providers.
- Development impact fees. State law (Gov. Code §66324) bars impact fees on ADUs under 750 square feet. ADUs of 750 square feet or more can be charged proportionately to the main home’s size.
We don’t publish fee amounts we haven’t confirmed on an official schedule. Ask the city for a current estimate for your exact project. For more background, see ADU impact fees in California.
How long the permit takes
State law (Gov. Code §66317) gives a city 15 business days to tell you whether a submitted ADU application is complete, and 60 days from a complete application to approve or deny it. Those are backstops, not promises about your project. For eligible ADU Express projects, the city describes review taking 1–3 days. Standard submittals follow the regular plan check process. Corrections, missing documents, and outside-agency reviews can all add time. See our ADU permit timeline guide for how the clock works.
What does an ADU cost in Anaheim?
We don’t have Anaheim-specific construction cost data from an official or verified source, so we won’t publish a number. Costs depend on size, site conditions, utilities, design, and contractor pricing. Get several written bids and compare them line by line. Our California ADU cost breakdown explains the main cost categories.
If you’ve seen references to the CalHFA ADU Grant, note that it is a past program. Its funds were used up, and it isn’t accepting applications.
Frequently asked questions
Can I build a JADU in Anaheim?
Yes, within an existing single-family home. The city requires a recorded owner-occupancy covenant for JADUs before the building permit is issued.
Do I have to live on the property?
For a JADU, yes: owner occupancy is required in either the main home or the JADU, under a recorded covenant. For an ADU without a JADU, state law generally doesn’t allow owner-occupancy requirements. Confirm your situation with the city.
Can I use SB 9 instead?
SB 9 lot splits and two-unit projects are a separate state law from ADU rules, with different eligibility tests. Compare the two in our SB 9 vs. ADU guide, then confirm with the city.
Can I sell the ADU separately?
Only if the local government has opted in to a program under AB 1033 and your project meets its requirements. We didn’t find an Anaheim AB 1033 program on the city’s ADU pages. Check our guide to selling an ADU separately and ask the city directly. Don’t assume it’s allowed.
- City of Anaheim — ADU Anaheim
- City of Anaheim — ADU Express Process
- City of Anaheim — Pre-Approved Plan Catalogue
- City of Anaheim — Building Division
- OC Development Services — Pre-Approved ADU Plans (unincorporated)
- HCD Accessory Dwelling Unit Handbook (March 2026)
- California HCD — Accessory Dwelling Units
Rules change, and every lot is different. Confirm current requirements with the City of Anaheim before you design, buy, or build. When you’re ready to map out your project, try the free ADU planner.