ADU Rules in the City of Riverside
The City of Riverside offers custom ADU plans or permit-ready plans through Dwell Riverside: four single-story detached designs from 746 to 1,200 sq ft. The city lists a 3-business-day initial plan review for pre-approved plans; later reviews take 10 business days.
This page covers the City of Riverside, California only. If your parcel is in unincorporated Riverside County or another city, different local rules apply. State law (Gov. Code §66310 et seq.) sets the floor; verify with the city before you design or build.
HomeBuyers Alliance is a 501(c)(3) nonprofit. We make no contractor referrals, don’t endorse builders or plan vendors, and don’t sell plans. This guide is education only, not legal advice.
The short answer
In the City of Riverside you can build an ADU with custom plans or with the city’s permit-ready plans through Dwell Riverside. The permit-ready path offers four single-story detached designs, and the city lists a 3-business-day turnaround for the first plan review. Both paths still go through building permit review, and your lot must meet eligibility rules.
For the statewide rules every California city must follow, start with our California ADU guide and the 2027 California ADU law roundup.
Is your lot in the City of Riverside?
A Riverside mailing address doesn’t always mean your parcel is inside city limits. The city points applicants to MapRiverside to locate a property. For help with eligibility, the city lists the Planning Division at 951-826-5800. If your parcel turns out to be outside the city, the rest of this page won’t apply to you.
City of Riverside vs. Riverside County
Unincorporated Riverside County follows county rules. The county says it adopted an updated Additional Residential Accommodations ordinance, covering ADUs, JADUs, and other unit types, at a Board of Supervisors hearing on September 1, 2026, and that it’s now in effect. See the county’s ARA page. For a nearby city, see our Menifee ADU page.
What the city’s ADU page says
The city’s Dwell Riverside page says most residential properties in Riverside can have an ADU, a JADU, or both. It lists two routes:
- Custom ADU plans, designed by a licensed professional and submitted through the city’s Public Permit Portal.
- Permit-ready ADU plans: pre-reviewed, customizable plans the city describes as faster and more cost-effective.
The city says both routes go through the standard building permit review process. It also says pre-review can help lower preconstruction architecture and engineering costs. Plans offer multiple exterior finishes and layouts that can be adapted to site conditions.
Pre-approved and permit-ready plans
Since January 1, 2025, California law (Gov. Code §65852.27, from AB 1332) has required cities and counties to have a process for preapproving ADU plans. Riverside’s Permit-Ready ADU Plans page lists four single-story detached plans:
- 746 sq ft, 1 bedroom, 1 bath
- 800 sq ft, 2 bedrooms, 2 baths
- 1,020 sq ft, 2 bedrooms, 2 baths
- 1,200 sq ft, 3 bedrooms, 2 baths
Elevations come in Craftsman, Ranch, and Spanish styles. The city’s steps are: confirm eligibility, select a plan, prepare a preliminary site plan, complete the T1.1 cover sheet, complete the Hold Harmless Agreement and Planning ADU Express Clearance Form, and apply online. After review, you get a conditions report to clear before the permit is issued. The city’s eligibility form says approval of the form doesn’t guarantee eligibility.
Pre-approved plans save design and review time, but they don’t remove site work. You still need a site plan, utility planning, and any reports your lot requires. Our guide to pre-approved ADU plans in California explains what “pre-approved” does and doesn’t cover. If you want to sort through your options first, the free ADU planner can help you organize questions before you call the city.
Fees: what to expect (without guessing numbers)
Riverside’s permit-ready page says the building permit is issued once all conditions are met and all fees are paid. It doesn’t list amounts. Note that three of the four permit-ready plans are 750 square feet or more, so impact fees could apply at those sizes. Ask the city for a current estimate.
Common fee types on a California ADU include:
- Plan check and building permit fees, charged by the city for review and inspections.
- School fees, charged by the school district, not the city.
- Utility and connection charges, which depend on your water, sewer, and electric providers.
- Development impact fees. State law (Gov. Code §66324) bars impact fees on ADUs under 750 square feet. ADUs of 750 square feet or more can be charged proportionately to the main home’s size.
We don’t publish fee amounts we haven’t confirmed on an official schedule. Ask the city for a current estimate for your exact project. For more background, see ADU impact fees in California.
How long the permit takes
State law (Gov. Code §66317) gives a city 15 business days to tell you whether a submitted ADU application is complete, and 60 days from a complete application to approve or deny it. Those are backstops, not promises about your project. For permit-ready plans, the city lists a 3-business-day turnaround for the initial plan review and 10 business days for any later reviews. Clearing conditions and paying fees come after that. Corrections, missing documents, and outside-agency reviews can all add time. See our ADU permit timeline guide for how the clock works.
What does an ADU cost in Riverside?
We don’t have Riverside-specific construction cost data from an official or verified source, so we won’t publish a number. Costs depend on size, site conditions, utilities, design, and contractor pricing. Get several written bids and compare them line by line. Our California ADU cost breakdown explains the main cost categories.
If you’ve seen references to the CalHFA ADU Grant, note that it is a past program. Its funds were used up, and it isn’t accepting applications.
Frequently asked questions
Can I build a JADU in Riverside?
The city’s Dwell Riverside page says most residential properties can have an ADU, a JADU, or both. State law caps a JADU at 500 square feet within a single-family home. Confirm with the city.
Do I have to live on the property?
State law requires owner occupancy for a JADU (in either the main home or the JADU). For an ADU without a JADU, state law generally doesn’t allow owner-occupancy requirements. Confirm with the city.
Can I use SB 9 instead?
SB 9 lot splits and two-unit projects are a separate state law from ADU rules, with different eligibility tests. Compare the two in our SB 9 vs. ADU guide, then confirm with the city.
Can I sell the ADU separately?
Only if the local government has opted in to a program under AB 1033 and your project meets its requirements. We didn’t find a City of Riverside AB 1033 program on the city’s ADU pages. Check our guide to selling an ADU separately and ask the city directly. Don’t assume it’s allowed.
Rules change, and every lot is different. Confirm current requirements with the City of Riverside before you design, buy, or build. When you’re ready to map out your project, try the free ADU planner.