Bakersfield runs an ADU Standard Plans Gallery that includes reduced-fee pre-reviewed designs. ADUs need a planning application and then a building permit. The city says planning applications are reviewed within 30 working days.
This page covers the City of Bakersfield, California only. If your parcel is in unincorporated Kern County or another city, different local rules apply. State law (Gov. Code §66310 et seq.) sets the floor; verify with the city before you design or build.
Yes, you can build an ADU in the City of Bakersfield. The city runs an ADU Standard Plans Gallery with a set of reduced-fee pre-reviewed plans. You apply for a planning permit first, then a building permit.
Is your lot in the City of Bakersfield?
The city’s ADU process handout points you to its GIS Mapping Portal to check your property and any development or utility requirements. Many Bakersfield-area addresses are in unincorporated Kern County, so check that you’re inside city limits. Questions go to the Planning Division at 661-326-3733 or devpln@bakersfieldcity.us.
City of Bakersfield vs. Kern County
If your parcel is in unincorporated Kern County, Kern County Planning sets local ADU rules, not the city. Verify with Kern County Planning. State law sets the same floor for both. For another Central Valley city, see our Fresno page.
What the city’s ADU page says
Start with the city’s ADU page. The details below come from two official city handouts, The ADU Process and the city’s ADU FAQ. When we checked, they said:
- Planning first, then building. You submit a planning application and site development plan to the Planning Division, then a building permit application with a separate fee.
- Get a planner’s advice. The city invites you to bring a sketch of your property so a city planner can tell you what rules might apply.
- Special Permit. If a project doesn’t meet city standards, like exceeding size or height limits, it may need a Special Permit with more review and possibly a public hearing.
- Permit validity. Once issued, your building permit is valid for one year.
- Utilities and school fees. New or separate utility connections may be required for ADUs, and other agencies may have requirements.
The handouts also describe ADUs as up to 1,200 sq. ft. depending on bedroom count, and JADUs as up to 500 sq. ft. inside the existing home.
Pre-approved and permit-ready plans
The city’s FAQ says Bakersfield has an ADU Standard Plans Online Gallery with two kinds of plans:
- Ready-made or standard plans submitted by architects, designers, and builders, chosen by the city, and available at a reduced cost. These still need code compliance review.
- Pre-reviewed plans, a subset the city’s Building Division has already reviewed for code compliance. The city says they’re available at a reduced fee, but they still need to be tailored to your site and submitted for a permit.
The gallery itself is hosted by a third-party website, not the city. The city doesn’t list fee amounts for these plans, and we don’t recommend any designer. Ask the Planning Division for the current gallery link and which plans are pre-reviewed. Every California city must offer a plan pre-approval process under AB 1332 (Gov. Code §65852.27).
If you want to compare layouts before you talk to the city, the free ADU planner can help you sketch options. Our pre-approved ADU plans guide explains how these programs work statewide.
ADU fees in Bakersfield
We didn’t find a Bakersfield ADU fee amount we could cite, so we don’t list one. The city’s process handout says the planning application fee “is based on project valuation and square footage,” and the building permit has a separate fee. Ask the Planning Division for current amounts.
Every California ADU project pays some mix of these, and the city’s schedule sets the actual amounts:
- Plan check and building permit fees, usually based on project valuation or square footage.
- School district developer fees, charged by the school district, not the city, and usually based on new square footage.
- Utility connection or capacity charges, which can come from the city or a separate water, sewer, or power provider. See our guide to ADU utility hookup costs.
- Impact fees. Under state law (Gov. Code §66324), an ADU under 750 square feet can’t be charged impact fees, and fees for larger ADUs must be proportional to the main home. Our ADU impact fees guide explains the rules.
How long does an ADU permit take?
State law sets a backstop for every city. Under Gov. Code §66317, the city must tell you within 15 business days whether your application is complete, and must approve or deny a complete ADU permit application within 60 days. Those are deadlines for the city’s review, not a promise of when you’ll get a permit. Corrections, resubmittals, and other agencies can add time. Our ADU permit timeline guide walks through each step.
The city’s process handout says a planning application “will be reviewed within 30 working days,” and you’ll be told if corrections are needed. The building permit review comes after that. The handout says construction times vary, but 12 to 18 months is common. That’s the city’s general estimate, not a promise for your project.
What does an ADU cost in Bakersfield?
We don’t have Bakersfield-specific construction cost data we can cite, so we don’t list a number. Costs depend on size, site conditions, design, utilities, and the builder you choose. For the cost categories to plan for, see our California ADU cost breakdown. Get written quotes from licensed contractors, and check them against our contractor quote checklist.
Frequently asked questions
Can I build a JADU in Bakersfield?
State law allows a junior ADU (JADU) of up to 500 square feet inside a single-family home, including an attached garage. A JADU needs an efficiency kitchen. If it shares a bathroom with the main home, the owner must live on the property. Confirm the details with the city before you design.
Do I have to live on the property to build an ADU?
For a regular ADU, state law doesn’t let cities require owner-occupancy. JADUs are different, as noted above. Ask the city if your project has any recorded covenants or deed restrictions.
Is SB 9 the same as an ADU?
No. SB 9 lets some single-family lots add a second main home or split the lot. It has different rules, fees, and owner-occupancy requirements. See our SB 9 vs ADU guide.
Can I sell my Bakersfield ADU separately from the house?
Usually not. AB 1033 lets a city choose to allow ADUs to be sold separately as condominiums, but only if that city adopts a local ordinance. We did not find an official City of Bakersfield statement that it has opted in, so ask the city before you plan on it. See selling an ADU separately.
Is there a state grant for ADUs?
The CalHFA ADU Grant Program was a past state program, and its funds are no longer available. We did not find a current city ADU grant to list here.
Official links
- City of Bakersfield — ADUs in Bakersfield
- City of Bakersfield — The ADU Process (handout)
- City of Bakersfield — ADU FAQ (handout)
- Bakersfield Planning Division: 661-326-3733 · devpln@bakersfieldcity.us
- Kern County Planning
- HCD ADU Handbook (March 2026)
- California HCD ADU page
For the statewide rules, start with our California ADU guide and California ADU laws for 2027.
When you’re ready to think through size and layout, try the free ADU planner.
HomeBuyers Alliance is a nonprofit. We don’t sell ADUs, refer contractors, or take payment from builders. This page is general information, not legal advice. Rules change, so confirm everything with the City of Bakersfield before you design, buy, or build.