ADU Rules in the City of San Francisco

San Francisco allows converted, attached, detached, and junior ADUs under a local program and the state program. The city runs a pre-approval intake for detached ADU designs, but property owners still need a site-specific permit. Fees and timelines are set by the city and state law.

City of San Francisco only

This page covers the City of San Francisco, California only. If your parcel is in another city or county, different local rules apply. State law (Gov. Code §66310 et seq.) sets the floor; verify with the city before you design or build. San Francisco is a consolidated city and county, so the city’s rules are the county’s rules.

The short answer

Yes, you can add an ADU in San Francisco, and the city lists four types: converted, attached, detached, and junior ADUs. San Francisco Planning runs both a local ADU program and the state program, and you apply online for a permit. Rules depend on your building type, so verify with SF Planning before you design.

Is your lot in the City of San Francisco?

San Francisco is one consolidated city and county, so any parcel inside the county is inside the city. What matters more here is your building type (single-family or multi-family) and your zoning district, since SF Planning’s options change based on both. Check your parcel with SF Planning’s ADU page and its contact, CPC.ADU@sfgov.org, before you spend money on design.

City of San Francisco vs. San Francisco County

There is no separate unincorporated area. The City and County of San Francisco is one government, so there’s no county ADU ordinance to compare against. If you’re looking at property just outside the city, rules differ in each Bay Area city. See our pages on Oakland, Berkeley, and San José.

What the city’s ADU page says

When we checked SF Planning’s ADU page, it said:

  • Four ADU types. Converted ADUs are new units inside existing or proposed space. Attached ADUs expand a residential building. Detached ADUs are new free-standing buildings. Junior ADUs convert up to 500 square feet in a single-family structure.
  • Citywide since 2016. The city’s ADU program became available citywide in 2016 in all zoning districts that allow residential use.
  • Two paths. The page describes a Local ADU program and the State ADU program, with a Director Bulletin for the state program and a chart for the local one. The type of ADU you can add depends on your building type and which program you use.
  • Pre-application meetings are advisory. SF Planning voluntarily joins the Department of Building Inspection’s pre-application meetings for ADU projects. The page says that feedback is advisory and isn’t an approval.
  • Apply online. The page links to an online permit application.

Parts of the page still refer to 2020 state law updates. State ADU law has been reorganized since then into Gov. Code §66310 et seq., so ask SF Planning how current state rules apply to your project.

Pre-approved and permit-ready plans

San Francisco has a pre-approval program for detached ADU designs, run by the Department of Building Inspection (DBI). When we checked the city’s pre-approval page, it was aimed at building designers who want a plan added to the program. The page says:

  • Submitted plans should be designed for 25-foot lots.
  • Pre-approval is only valid during the current building code cycle.
  • Pre-approved plans can’t be used in slope protection areas, landslide and liquefaction zones, Maher Zones, or flood zones.
  • A pre-approved plan still goes into a site-specific permit application. The city checks Planning Code compliance, soils, fire access, school fees, and other site items.

We didn’t find a list of approved plans that homeowners can pick from on that page. If you want to use a pre-approved design, ask DBI which plans are currently approved. This program exists because of AB 1332 (Gov. Code §65852.27), which requires every California city to offer a plan pre-approval process.

If you want to compare layouts before you talk to the city, the free ADU planner can help you sketch options. Our pre-approved ADU plans guide explains how these programs work statewide.

ADU fees in San Francisco

We didn’t find a San Francisco ADU fee amount that homeowners pay that we could cite, so we don’t list one. The pre-approval page lists a fee for designers who submit plans, not a permit fee for homeowners. Ask DBI for the current fee schedule for your project.

Every California ADU project pays some mix of these, and the city’s schedule sets the actual amounts:

  • Plan check and building permit fees, usually based on project valuation or square footage.
  • School district developer fees, charged by the school district, not the city, and usually based on new square footage.
  • Utility connection or capacity charges, which can come from the city or a separate water, sewer, or power provider. See our guide to ADU utility hookup costs.
  • Impact fees. Under state law (Gov. Code §66324), an ADU under 750 square feet can’t be charged impact fees, and fees for larger ADUs must be proportional to the main home. Our ADU impact fees guide explains the rules.

How long does an ADU permit take?

State law sets a backstop for every city. Under Gov. Code §66317, the city must tell you within 15 business days whether your application is complete, and must approve or deny a complete ADU permit application within 60 days. Those are deadlines for the city’s review, not a promise of when you’ll get a permit. Corrections, resubmittals, and other agencies can add time. Our ADU permit timeline guide walks through each step.

We didn’t find a San Francisco-specific ADU review time on the city pages we checked. Ask DBI or SF Planning what to expect for your project.

What does an ADU cost in San Francisco?

We don’t have San Francisco-specific construction cost data we can cite, so we don’t list a number. Costs depend on size, site conditions, design, utilities, and the builder you choose. For the cost categories to plan for, see our California ADU cost breakdown. Get written quotes from licensed contractors, and check them against our contractor quote checklist.

Frequently asked questions

Can I build a JADU in San Francisco?

State law allows a junior ADU (JADU) of up to 500 square feet inside a single-family home, including an attached garage. A JADU needs an efficiency kitchen. If it shares a bathroom with the main home, the owner must live on the property. SF Planning’s page says JADUs convert up to 500 square feet in a single-family structure, and owner-occupancy is required if the JADU shares sanitation facilities with the main home.

Do I have to live on the property to build an ADU?

For a regular ADU, state law doesn’t let cities require owner-occupancy. JADUs are different, as noted above. Ask the city if your project has any recorded covenants or deed restrictions.

Is SB 9 the same as an ADU?

No. SB 9 lets some single-family lots add a second main home or split the lot. It has different rules, fees, and owner-occupancy requirements. See our SB 9 vs ADU guide.

Can I sell my San Francisco ADU separately from the house?

Usually not. AB 1033 lets a city choose to allow ADUs to be sold separately as condominiums, but only if that city adopts a local ordinance. We did not find an official City of San Francisco statement that it has opted in, so ask the city before you plan on it. See selling an ADU separately.

Is there a state grant for ADUs?

The CalHFA ADU Grant Program was a past state program, and its funds are no longer available. We did not find a current city ADU grant to list here.

For the statewide rules, start with our California ADU guide and California ADU laws for 2027.

When you’re ready to think through size and layout, try the free ADU planner.

HomeBuyers Alliance is a nonprofit. We don’t sell ADUs, refer contractors, or take payment from builders. This page is general information, not legal advice. Rules change, so confirm everything with the City of San Francisco before you design, buy, or build.