ADU Rules in the City of Irvine

The City of Irvine reviews ADU and JADU applications under state law. Every project needs a Residential ADU (RADU) application and an ADU Verification Form from Planning, submitted through the IrvineReady! portal. The city also runs a Pre-Approved ADU Plans Program.

City of Irvine only

This page covers the City of Irvine, California only. If your parcel is in unincorporated Orange County or another city, different local rules apply. State law (Gov. Code §66310 et seq.) sets the floor; verify with the city before you design or build.

About HomeBuyers Alliance

HomeBuyers Alliance is a 501(c)(3) nonprofit. We make no contractor referrals, don’t endorse builders or plan vendors, and don’t sell plans. This guide is education only, not legal advice.

The short answer

The City of Irvine says it reviews ADU and JADU applications under state statute. Every ADU and JADU project needs a completed Residential Accessory Dwelling Unit (RADU) application and an ADU Verification Form from the Planning Team, submitted online through IrvineReady!. The city also offers a Pre-Approved ADU Plans Program.

For the statewide rules every California city must follow, start with our California ADU guide and the 2027 California ADU law roundup.

Is your lot in the City of Irvine?

An Irvine mailing address doesn’t always mean your parcel is inside city limits. Irvine’s ADU Verification Form, which you get from the Planning Team at planning@cityofirvine.org or 949-724-6308, is the city’s starting point for confirming your property’s details. If your parcel turns out to be outside the city, the rest of this page won’t apply to you.

City of Irvine vs. Orange County

Unincorporated Orange County is handled by OC Development Services, not by any city. The county posts its own pre-approved ADU plans page. Nearby cities each set their own local standards within state law: see our pages for Anaheim, Santa Ana, and Laguna Niguel.

What the city’s ADU page says

The city’s Constructing an ADU page lists these submittal items:

  • ADU Verification Form (from the Planning Team)
  • A completed ADU permit application
  • Building plans, calculations, and construction documents
  • Development Standards Checklist for the site plan
  • Hold Harmless Affidavit
  • A covenant, which must be notarized and recorded with the Orange County Recorder when your case planner tells you
  • A signed owner and applicant affidavit, and a Developer Deposit Case Set-Up form
  • School Fee Determination, Transportation Corridor Agency, and address application forms (included in the application package)

Applications go through the IrvineReady! online portal, which the city says works best in Google Chrome.

Pre-approved and permit-ready plans

Since January 1, 2025, California law (Gov. Code §65852.27, from AB 1332) has required cities and counties to have a process for preapproving ADU plans. Irvine’s Pre-Approved ADU Plans Program offers architectural and structural plans designed by licensed professionals and approved by the city for building code compliance. You still submit the plan with a building permit application, and the city reviews site-specific factors such as zoning and foundation requirements. The city’s steps are: select a plan, submit the application, go through site-specific review, then receive approval and a building permit if everything is in order.

Pre-approved plans save design and review time, but they don’t remove site work. You still need a site plan, utility planning, and any reports your lot requires. Our guide to pre-approved ADU plans in California explains what “pre-approved” does and doesn’t cover. If you want to sort through your options first, the free ADU planner can help you organize questions before you call the city.

Fees: what to expect (without guessing numbers)

Irvine’s ADU page says you’ll be emailed a link to pay required fees after the completeness check, and points to the city’s Fee Schedule page for current rates. The application package includes a school fee determination form, so school fees are part of the process. We don’t list amounts.

Common fee types on a California ADU include:

  • Plan check and building permit fees, charged by the city for review and inspections.
  • School fees, charged by the school district, not the city.
  • Utility and connection charges, which depend on your water, sewer, and electric providers.
  • Development impact fees. State law (Gov. Code §66324) bars impact fees on ADUs under 750 square feet. ADUs of 750 square feet or more can be charged proportionately to the main home’s size.

We don’t publish fee amounts we haven’t confirmed on an official schedule. Ask the city for a current estimate for your exact project. For more background, see ADU impact fees in California.

How long the permit takes

State law (Gov. Code §66317) gives a city 15 business days to tell you whether a submitted ADU application is complete, and 60 days from a complete application to approve or deny it. Those are backstops, not promises about your project. Irvine says staff review submitted plans for completeness within approximately two business days. Your project is processed for review after fees are paid. Later review times aren’t listed on the ADU page. Corrections, missing documents, and outside-agency reviews can all add time. See our ADU permit timeline guide for how the clock works.

What does an ADU cost in Irvine?

We don’t have Irvine-specific construction cost data from an official or verified source, so we won’t publish a number. Costs depend on size, site conditions, utilities, design, and contractor pricing. Get several written bids and compare them line by line. Our California ADU cost breakdown explains the main cost categories.

If you’ve seen references to the CalHFA ADU Grant, note that it is a past program. Its funds were used up, and it isn’t accepting applications.

Frequently asked questions

Can I build a JADU in Irvine?

Yes. Irvine’s ADU page covers both ADU and JADU applications, and both need the RADU application and ADU Verification Form. State law caps a JADU at 500 square feet within a single-family home.

Do I have to live on the property?

State law requires owner occupancy for a JADU (in either the main home or the JADU). For an ADU without a JADU, state law generally doesn’t allow owner-occupancy requirements. Irvine requires a recorded covenant as part of submittal; ask Planning what yours will contain.

Can I use SB 9 instead?

SB 9 lot splits and two-unit projects are a separate state law from ADU rules, with different eligibility tests. Compare the two in our SB 9 vs. ADU guide, then confirm with the city.

Can I sell the ADU separately?

Only if the local government has opted in to a program under AB 1033 and your project meets its requirements. We didn’t find an Irvine AB 1033 program on the city’s ADU pages. Check our guide to selling an ADU separately and ask the city directly. Don’t assume it’s allowed.

Rules change, and every lot is different. Confirm current requirements with the City of Irvine before you design, buy, or build. When you’re ready to map out your project, try the free ADU planner.