How to Find a Lot Eligible for an SB 9 Split (If You're the Buyer)
Buyers can screen California lots for single-family zoning, exclusions and local objective standards, but cannot compel an owner to split or treat screening as approval. Confirm who may apply and what signatures or authorization the permitting agency requires. Gov. Code §66411.7(g) imposes an applicant occupancy-intention affidavit, with specified exemptions, not an exclusive current-owner application rule.
A buyer cannot compel a property owner to split a lot or treat a map screen as approval. Under Gov. Code §66411.7(g)(1), the applicant must sign an affidavit stating an intention to occupy one housing unit as their principal residence for at least three years from split approval; community land trusts and qualified nonprofit corporations meeting §66411.7(g)(2) are exempt. The statute does not make this an exclusive current-owner filing rule. Before agreeing to buy, ask the city or county who may file and what signatures or authorization documents it requires, and plan seller cooperation and approval contingencies with counsel.
This page does not certify that any address is SB 9–eligible. Public maps and zoning look-ups are screening tools, not approvals. Do not cold-pressure owners — especially seniors — and do not treat this as legal advice.
Which SB 9 law governs this guide?
This guide concerns the 2021 housing law SB 9 (Chapter 162), now implemented through current Gov. Code §§65852.21 and 66411.7, not a bill nickname in isolation. Use the current code text for eligibility. SB 1426 (Stats. 2026, ch. 56, §§7 and 9, effective June 30, 2026) amended these sections as part of a reporting-law reorganization; it is not a new blanket lot-split entitlement.
What “eligible” means at the state level
HCD’s September 2024 SB 9 Fact Sheet and the current code sections frame eligibility around themes like these (confirm the exact text for your facts):
Urban lot split (§66411.7) — high-level themes
- Single-family residential zone (primary purpose single-family; not multi-family/commercial/ag as the SB 9 mandate zone).
- Urbanized area / urban cluster location tests for city and unincorporated parcels.
- One split only: the parcel was not already created by a prior §66411.7 urban lot split; and neither the owner nor someone acting in concert previously used an urban lot split on an adjacent parcel.
- Size / area: resulting parcels generally ≥ 1,200 sq ft each (locals may adopt a smaller ministerial minimum by ordinance); roughly equal area with neither parcel under 40% of the original lot area.
- Anti-displacement / historic limits (tenant occupancy in last three years; rent-restricted or rent-controlled housing; Ellis Act withdrawals within lookback; certain historic listings/districts).
- Site constraint cross-references to §65913.4(a)(6)(B)–(K) as that section read on Sept 16, 2021 (wetlands, high fire severity with limited exceptions, hazardous waste, flood/earthquake fault, etc. — see HCD sheet and counsel for the crosswalk).
- Owner-occupancy affidavit for the applicant (3 years), with CLT / qualified-nonprofit exemptions as written in statute.
- Locals may require easements, right-of-way access, and limited parking (with transit/car-share exceptions).
Under §66411.7(b)(3), a local agency cannot require right-of-way dedications or construction of offsite improvements as a condition of issuing the urban-lot-split parcel map. It may still require public-service/facility easements and right-of-way access under §66411.7(e). This narrow map-condition protection does not make utility connections free or waive lawful requirements at other project phases.
Safety and rental limits: Under §66411.7(d) (and §65852.21(d) for two-unit projects), denial requires the building official’s written finding, based on a preponderance of the evidence, of a specific adverse public-health/safety impact with no feasible satisfactory mitigation or avoidance. Rentals of units created under these paths must be for more than 30 days (§66411.7(h); §65852.21(e)); do not underwrite a short-term-rental plan.
Two-unit projects without a split (§65852.21)
Separately, SB 9 requires ministerial review of a housing development with no more than two residential units in a single-family zone when statutory criteria are met. Objective local standards may apply unless they physically preclude up to two units or units of at least 800 square feet — with the familiar 4-foot side/rear setback ceiling and other statutory limits. Combining a two-unit project and a lot split can change how many ADUs/JADUs a local agency must allow (§65852.21(f); §66411.7(j)).
Local objective standards — what they can and cannot do
Locals may adopt objective zoning, subdivision, and design standards that do not conflict with these sections. They may not use objective standards to erase the core state entitlements (for example, physically precluding two units or preventing each unit from having at least 800 square feet where the statute protects that floor). Framing this as “cities may always be stricter” overstates local power — ask planning staff how their ordinance implements the state floors.
What a buyer can screen before talking to an owner
Useful, non-guaranteed screens:
- City vs county — Is the parcel inside city limits or unincorporated?
- Zoning — Does the official map show a single-family residential zone subject to SB 9?
- Existing units / tenants — Multiple dwellings, recent tenancies, or rent-restricted stock can block paths.
- Obvious overlays — Check mapped floodways, very high fire severity, historic resources and coastal overlays. The Coastal Act still applies, but the local agency is not required to hold public hearings for CDP applications for projects under these paths (§66411.7(n); §65852.21(k)). This does not waive a CDP or every other coastal process.
- Prior split clues — Recent parcel maps that look like SB 9 halves; ask title/planning whether §66411.7 was already used.
- Local SB 9 ordinance page — Many cities publish checklists; treat them as local process, not a rewrite of statute.
None of this replaces a completed application or establishes eligibility before purchase.
Who applies, and what should a buyer confirm?
Section 66411.7(g) describes the applicant’s occupancy-intention affidavit, not an exclusive right of the current owner to file. Ask the permitting agency who may submit, what owner signatures or authorization documents it requires, and how the affidavit and statutory exemptions apply to the proposed applicant. No jurisdiction-specific authorization rule is established here. Agree with the seller and counsel on cooperation, access for studies and approval contingencies; do not assume an option contract itself authorizes a filing or guarantees a split.
After interest: realistic sequence
- Confirm the filing arrangement with the local agency: who may apply, required signatures or authorization, and the applicant’s affidavit or exemption. Coordinate the complete urban-lot-split and/or two-unit application and contractual cooperation with the seller and counsel.
- Completed-application clocks: Current §66411.7(b)(1) and §65852.21(h) each require the agency to approve or deny a completed application within 60 days, or it is deemed approved, with written deficiency comments on denial. These are SB 9 clocks, not the separate ADU §66317 clocks — and they still assume a complete filing.
- Map, survey, easements, utilities — Engineering and title work often dominate calendar time after the ministerial decision.
- Financing & sale — New APNs, carry costs, and construction loans: see cost to build on an SB 9 lot.
- Counsel for both sides — Especially gifts, family transfers, and option agreements. Related: parents selling land to build and buying part of a lot via SB 9.
Ethics for buyers
Respectful outreach only. Do not target vulnerable owners. Put agreements in writing with independent attorneys. Compare ownership structures with lot split vs ADU ownership and SB 9 vs ADU.
Frequently asked questions
Can the city require street improvements for an SB 9 parcel map?
Under §66411.7(b)(3), a local agency cannot require right-of-way dedications or construction of offsite improvements as a condition of issuing the urban-lot-split parcel map. It may still require public-service/facility easements and right-of-way access under §66411.7(e). This narrow map-condition protection does not make utility connections free or waive lawful requirements at other project phases.
Can a buyer force an SB 9 split?
No. Screening a lot or wanting to buy it does not entitle you to compel the owner to split. Ask the permitting agency who may apply and what signatures or owner-authorization documents it requires; ask counsel what your agreement with the seller actually permits. An option contract does not itself establish statutory eligibility or guarantee approval. The applicant affidavit and exemptions are separate questions under §66411.7(g).
Does every single-family lot qualify?
No. Zone, urbanized-area tests, hazard/historic/tenant exclusions, prior-split rules, and local objective standards all matter.
Is the minimum new lot always 1,200 square feet?
Default yes under §66411.7 — unless the local agency adopted a smaller ministerial minimum by ordinance. Confirm locally.
Can local design standards prevent an SB 9 project?
Objective standards are allowed, but they cannot conflict with the statute’s unit-count and unit-size protections. Get the ordinance and HCD guidance in front of counsel if staff say “not allowed here” without a statutory exclusion.
Is the SB 9 60-day clock the same as the ADU permit clock?
No. ADU completeness/decision clocks live mainly in §66317. SB 9 two-unit and lot-split applications have their own 60-day completed-application rules in §65852.21 and §66411.7.
Official links
State-law and key local-source recheck: November 6, 2026. Posted amounts and programs can change; resolve the specific conflicts noted above before relying on them.
- Gov. Code §65852.21
- Gov. Code §66411.7
- HCD SB 9 Fact Sheet (PDF)
- Companion: cost to build on an SB 9 lot · can I build an ADU on my lot?
Browse the California housing education hub for related guides.
HomeBuyers Alliance is a nonprofit. We don’t buy lots, broker splits, or take payment from builders or lenders. This page is general information, not legal advice.
Primary sources
- Gov. Code §65852.21 — two-unit housing development — Amended Stats. 2026, Ch. 56 (SB 1426), eff. June 30, 2026
- Gov. Code §66411.7 — urban lot split — Amended Stats. 2026, Ch. 56 (SB 1426), eff. June 30, 2026
- HCD — SB 9 Fact Sheet (Sept 2024) — Implementation guidance
- ABAG — SB 9 Overview (Apr 2025 PDF) — Regional overview; prefer current code + HCD for legal detail