ADU Rules in the City of Fremont

Fremont allows ADUs and JADUs under city rules that implement state ADU law. The city runs a preapproved-plan program, but 2022-code plans were invalidated when 2025 codes took effect on January 1, 2026, and site-specific permits are still required. Fees and timelines are set by the city and state law.

City of Fremont only

This page covers the City of Fremont, California only. If your parcel is in unincorporated Alameda County or another city, different local rules apply. State law (Gov. Code §66310 et seq.) sets the floor; verify with the city before you design or build.

The short answer

Yes, you can add an ADU or junior ADU (JADU) in Fremont. The city’s Community Development Department reviews ADU permits, and Fremont runs a preapproved detached-ADU plan program — but every project still needs a site-specific permit, and plans approved under the 2022 building-code cycle were invalidated when 2025 codes took effect on January 1, 2026. Fees and timelines are local, with state-law backstops.

Is your lot in the City of Fremont?

Confirm your address and zoning in the city’s eGIS Public Viewer before you design. Fremont’s rules cover parcels inside city limits only. Questions: planinfo@fremont.gov or Zoning Line 510-494-4455.

City of Fremont vs. Alameda County

Fremont is an incorporated city. Unincorporated Alameda County uses county planning rules and a separate permit path through the County Permit Center. Nearby cities set their own rules. See our Oakland and Berkeley guides, and Alameda County’s ADU page for unincorporated parcels.

What the city’s ADU page says

When we checked Fremont’s ADU page, it said:

  • ADUs and JADUs are allowed. ADUs are attached or detached units with complete living facilities on the same parcel as a principal residence (single-family or multi-family, subject to city rules). JADUs are no more than 500 square feet inside a single-family residence (including an attached garage) with an efficiency kitchen; the bathroom may be shared or separate.
  • Local ordinance. On July 11, 2023, the City Council adopted Ordinance 06-2023. The rules are codified at Fremont Municipal Code §18.190.005 and took effect August 11, 2023. The city also posts an ADU informational handout for single-family zoning districts; the municipal code and state law control if anything conflicts.
  • Separate ADU permit. An ADU needs its own permit, even if it is attached to the main house or built at the same time as a remodel. Combined applications that mix primary-residence work with ADU work are rejected and cause delay.
  • Amnesty path. The city says it complies with AB 2533 with an ADU amnesty program for certain unpermitted units. Ask Planning what evidence and steps apply.

Ask Planning how current Gov. Code §66310 et seq. rules interact with the 2023 local ordinance on your project.

Pre-approved and permit-ready plans

Fremont runs a preapproved ADU program for detached ADU plans submitted by qualified design professionals. That program exists alongside AB 1332 (Gov. Code §65852.27), which required every California local agency to have an ADU plan-preapproval program by January 1, 2025.

What the city page said when we checked:

  • Preapproved plans are meant to support expedited plan review and a lower plan-review fee than a standard custom submittal.
  • Applications that use a current preapproved plan are reviewed in 7 business days, versus 15 business days for standard applications.
  • Applicants using a preapproved plan pay a flat $1,000 plan-review fee. Construction and inspection fees still apply and vary.
  • You must contract with the designer responsible for the plan set. Preapproval does not skip site-specific plans, studies, or engineering.
  • As a result of code changes that took effect on January 1, 2026, preapproved plans designed under 2022 code regulations are invalid. The city asked designers to submit updated plans under the 2025 codes. Check the city’s current preapproved list before you assume a plan is usable.

Preapproval is not a building permit — site conditions, zoning, utilities, fire access, and school fees still have to clear. See our pre-approved ADU plans guide.

ADU fees in Fremont

Beyond the flat $1,000 preapproved plan-review fee above, see the city’s fees pages (master fee schedule and development-impact materials). We do not invent a total project fee — ask Planning and Building for an estimate.

Every California ADU project usually involves some mix of:

  • Plan check and building permit fees, often based on valuation or square footage.
  • School district developer fees, charged by the school district, not the city.
  • Utility connection or capacity charges, which may come from the city or from separate providers such as water or sanitary districts. See our guide to ADU utility hookup costs.
  • Impact fees. Under current state law (Gov. Code §66311.5, renumbered by SB 543, Stats. 2025, ch. 520, effective January 1, 2026), a local agency, special district, or water corporation may not impose an impact fee on an ADU that has 750 square feet of interior livable space or less, or on a JADU that has 500 square feet of interior livable space or less. Impact fees on a larger ADU must be charged proportionately in relation to the square footage of the primary dwelling. Connection fees and capacity charges are treated separately in the statute. Our ADU impact fees guide explains the rules. Future, not current: From January 1, 2027, SB 1117 (Stats. 2026, ch. 809) changes proportional impact fees on ADUs over 750 square feet to cover only interior livable space above 750 for up to two ADUs on a lot; properties with more than two have a separate rule.

How long does an ADU permit take?

Fremont publishes 7 business days for current preapproved-plan review versus 15 business days for standard applications. Verify the plan’s code-cycle eligibility first; those are city review targets, not a total project schedule.

Under Gov. Code §66317, written completeness notice is due within 15 business days of receipt; missing it makes the application (including a resubmittal) deemed complete. For a completed application on a lot with an existing single-family or multifamily dwelling, the decision is due within 60 days, otherwise deemed approved. An applicant-requested delay tolls that period. With a concurrent new primary dwelling application, the agency may wait for the primary permit decision, but ADU review remains without discretion or a hearing. These are review clocks, not construction or move-in dates. For qualifying detached applications using a current-code-cycle preapproved or identical previously approved plan, §65852.27(b) provides a 30-day completed-application decision rule. See ADU permit timelines.

What does an ADU cost in Fremont?

We do not have Fremont-specific construction cost data we can cite. Costs depend on size, site, design, utilities, and who builds. See our California ADU cost breakdown and get written contractor quotes.

Frequently asked questions

Can I still use Fremont’s 2022-code preapproved plans?

Not as previously approved. Fremont’s preapproved-plan page says 2022-code plans became invalid on January 1, 2026. Select a current 2025-code plan or ask the designer about resubmitting an updated set. Even current preapproval still needs site-specific plans, engineering where applicable and a city permit.

Can I build a JADU in Fremont?

A JADU is no more than 500 square feet of interior livable space, within the walls of a proposed or existing single-family residence; an attached garage counts, a detached accessory structure does not. It needs an efficiency kitchen and an entrance separate from the main entrance. Shared sanitation also requires interior entry to the main living area (Gov. Code §§66313(d), 66333(d)–(f)). Under Gov. Code §66333(b), owner-occupancy is required only if sanitation is shared: the owner may live in the main home or JADU. No owner-occupancy is required for separate sanitation, or when the owner is a governmental agency, land trust or housing organization. Confirm the required deed restriction with Planning.

Do I have to live on the property to build an ADU?

For a regular ADU, state law generally does not let cities require owner-occupancy. JADUs can be different when sanitation facilities are shared. Ask the city whether your project needs a recorded covenant or has other deed restrictions.

Is SB 9 the same as an ADU?

No. SB 9 is about adding a second primary dwelling or splitting certain single-family lots. It has different rules, fees, and owner-occupancy requirements. See our SB 9 vs ADU guide.

Can I sell my Fremont ADU separately from the house?

Usually not, unless the city has opted into AB 1033 condominium conversion rules with a local ordinance. We did not find an official City of Fremont statement that it has opted in, so ask Planning before you plan on a separate sale. See selling an ADU separately.

Is there a state grant for ADUs?

CalHFA’s ADU Grant page states in its December 28, 2023 update: “The latest round of ADU funding has been fully allocated.” That describes the funding round, not a declaration that the entire program ended. Do not assume a new round is open; check CalHFA’s current notices before relying on assistance. We did not find a current city ADU grant to list here.

State-law and key local-source recheck: November 6, 2026. Posted amounts and programs can change; resolve the specific conflicts noted above before relying on them.

For statewide rules, start with our California ADU guide and California ADU laws for 2027.

Browse the California housing education hub for related guides.

HomeBuyers Alliance is a nonprofit. We don’t sell ADUs, refer contractors, or take payment from builders. This page is general information, not legal advice. Rules change, so confirm everything with the City of Fremont before you design, buy, or build.

Primary sources