ADU Rules in the City of Berkeley
In the City of Berkeley, every ADU and JADU needs a building permit, and zoning compliance is reviewed as part of that permit. Berkeley has a gallery of pre-approved designs with a 50% plan check reduction. Confirm current rules and fees with the city.
This page covers the City of Berkeley, California only. If your parcel is in unincorporated Alameda County or another city, different local rules apply. State law (Gov. Code §66310 et seq.) sets the floor; verify with the city before you design or build.
Yes, ADUs and JADUs are allowed on eligible residential lots in the City of Berkeley. Every one needs a building permit, and the city reviews zoning as part of that permit, without a public hearing. Berkeley’s pre-approved designs qualify for a 50% plan check reduction.
HomeBuyers Alliance is a 501(c)(3) nonprofit. We make no contractor referrals, don’t endorse builders or plan vendors, and don’t sell plans. This guide is education only.
For the statewide picture, see our California ADU hub. This page covers what the City of Berkeley publishes.
Is your lot in the City of Berkeley?
Check before you plan. Berkeley’s ADU information sheet points you to the city’s Community GIS Portal, where the property and planning view shows your zoning district. If you’re not sure your parcel is inside city limits, ask the city’s Land Use Planning Division.
City of Berkeley vs. Alameda County
Unincorporated areas such as Castro Valley, San Lorenzo, and Ashland are handled by Alameda County Planning, not Berkeley. Other cities, including Oakland, set their own rules.
What the city’s ADU pages say
Berkeley’s Residential Additions and ADUs page and its ADU Information Sheet say:
- Where ADUs are allowed. On properties with an existing or proposed single-family home, and on lots with an existing duplex or multifamily building. The city’s ADU ordinance is BMC Chapter 23.306.
- Permit type. All ADUs and JADUs need a building permit. A zoning permit generally isn’t required. Review is ministerial, and approved ADU permits aren’t appealable.
- Size. The minimum ADU size is 190 sq ft. A JADU is inside the walls of a single-family home or its attached garage, needs a separate exterior entrance and at least an efficiency kitchen, and can’t exceed 500 sq ft.
- Lot coverage. Up to 800 sq ft is excluded from lot coverage and gross floor area calculations.
- Neighbor notice. Staff mail a courtesy notice to neighbors within 10 working days of your application. This is a notice, not a hearing.
- Deed restriction. You record a deed restriction with the Alameda County Clerk-Recorder before the permit is issued. It prohibits short-term rental of the ADU or JADU and limits selling it separately from the main home.
- Address. Every ADU except a JADU needs a new address assignment before permit issuance.
- Other local rules. ADUs are subject to Berkeley’s Creeks and Coast Live Oak ordinances. New ADUs are subject to the city’s Electrification Reach Code.
Pre-approved plans
Berkeley keeps a gallery of pre-approved ADU designs for detached ADUs, from studios to three-bedroom homes. The city says to:
- Ask Land Use Planning about zoning limits on your lot before you pick a design.
- Contact the designer, who helps you use the plan.
- Expect a 50% plan check fee reduction and often faster review.
Design changes aren’t accepted. Changes mean a new design and normal processing. Under AB 1332 (Gov. Code §65852.27), cities must also accept preapproval applications from designers. See pre-approved ADU plans in California. To test layouts first, try the free ADU planner.
Fees
Berkeley’s ADU information sheet lists these city charges at building permit submittal:
| Charge (per city ADU info sheet, v2026-08-20) | Amount |
|---|---|
| Zoning plan check fee | $250 |
| Neighbor noticing fee | $500 |
| Address assignment (ADUs, not JADUs) | $250 |
Building permit fees are based on project valuation, and the city offers a fee estimator. The city says Land Use Planning doesn’t charge impact fees. Berkeley Unified School District charges school fees on residential projects over 500 sq ft of livable space. Utility and other agency charges are separate. Fees change, so check the current fee schedule before you budget. For the state rules, see ADU impact fees in California.
Timeline
State law requires a completeness decision within 15 business days and action on a complete application within 60 days (Gov. Code §66317). Berkeley doesn’t publish a faster guaranteed time. See ADU permit timelines.
Costs
We don’t have Berkeley-specific construction cost data, so we don’t give numbers. Get several written quotes.
Berkeley ADU FAQ
Can I have a JADU? Yes, inside a single-family home or attached garage, up to 500 sq ft.
Can I rent the ADU short term? No. Berkeley’s required deed restriction prohibits short-term rental.
Can I sell the ADU separately? Berkeley’s deed restriction limits separate sale. Ask the city about AB 1033 before you assume otherwise.
What about SB 9? That’s a separate path. See SB 9 vs. ADU.
Is the CalHFA ADU Grant open? No. It was a past state program, and its funds are used up.
Official links
Primary sources
- City of Berkeley — Residential Additions and Accessory Dwelling Units
- City of Berkeley — ADU Information Sheet (v2026-08-20)
- City of Berkeley — Pre-Approved Designs for Accessory Dwelling Units
- City of Berkeley — Planning and Development Fee Schedule
- Alameda County Planning — Accessory Dwelling Units (unincorporated)
- HCD Accessory Dwelling Unit Handbook (March 2026) — Gov. Code §66310 et seq.
- California HCD — Accessory Dwelling Units