ADU Impact and Permit Fees in California

ADU fees come in three kinds: impact fees, permit and plan-check fees, and utility charges. State law already exempts ADUs of 750 sq ft or less from impact fees. SB 1117 changes the math for larger units starting in 2027. Here's how to get your city's real numbers.

The short answer

California ADUs can face three kinds of charges: impact fees, permit and plan-check fees, and utility connection costs. ADUs of 750 square feet or less are exempt from impact fees. Starting January 1, 2027, SB 1117 means larger ADUs (up to two per lot) pay impact fees only on space above 750 square feet. Permit and utility charges still apply.

California only

This article covers California law and California agencies only. Other states have different ADU rules (or none), so don’t apply these numbers or protections outside California.

About HomeBuyers Alliance

HomeBuyers Alliance is a 501(c)(3) nonprofit. We don’t refer contractors, endorse builders, or sell plans. This guide is education only — not legal, tax, or construction advice.

“How much are the fees?” is one of the first questions people ask about an ADU, and one of the hardest to answer in general. Fees are set city by city, district by district, and they change, often every year. This guide explains the types of fees, what state law limits, and how to get real numbers for your address.

Rules vary by city — verify with your local planning department. Everything below is general education, not a quote.

Impact fees vs. permit/plan-check fees vs. utility connection fees

It helps to separate three buckets, because state law treats them differently.

1. Impact fees. One-time charges that help pay for public services affected by new housing, such as parks, roads, or schools. These are the fees state law limits for ADUs.

2. Permit and plan-check fees. What your city or county charges to review your plans, issue the building permit, and run inspections. These pay for staff time. State ADU fee limits on impact fees do not make these go away.

3. Utility connection fees and capacity charges. Charges from water, sewer, and sometimes other providers to connect or upsize service. SB 1117’s amended Gov. Code § 66311.5(c)(2) says “impact fee” does not include connection fees or capacity charges. Those follow separate standards in § 66311.5(b), (d), and (e).

Then there are costs that aren’t fees at all, like running new lines or buying a meter. More on those below.

The 750 sq ft rule today

Under state law as summarized in HCD’s ADU Handbook (March 2026):

  • An ADU with 750 square feet or less of interior livable space is exempt from impact fees charged by local agencies, special districts, and water corporations.
  • A JADU with 500 square feet or less of interior livable space is also exempt.
  • An ADU over 750 square feet may be charged impact fees proportionately, based on its size compared with the main home.

“Interior livable space” is defined in state law as space intended for living, sleeping, eating, cooking, or sanitation, including bedrooms, bathrooms, kitchens, laundry rooms, closets, and interior stairs (HCD Handbook, citing Gov. Code § 66313(e)).

What SB 1117 changes on Jan 1, 2027

SB 1117 was signed September 29, 2026 and takes effect January 1, 2027 (Chapter 809, Statutes of 2026, amending Gov. Code § 66311.5). Fees for ADUs are governed by state ADU law (Gov. Code § 66310 et seq.; fees in § 66311.5), summarized in HCD’s March 2026 Handbook. SB 1117 changes how the proportional fee is figured for lots with up to two ADUs.

California state rules only:

Through Dec 31, 2026Starting Jan 1, 2027
ADU ≤ 750 sq ftExempt from impact feesExempt (unchanged)
JADU ≤ 500 sq ftExemptExempt (unchanged)
ADU > 750 sq ft (1st or 2nd ADU on lot)Prorated on full ADU sizeProrated only on sq ft above 750
3rd or later ADU on lotProrated on full sizeProrated on full size (unchanged)
Utility connection / capacity chargesSeparate rulesSeparate rules (unchanged)

A worked example (the same one BB&K’s secondary summary uses): if the impact fee for a 2,000-square-foot main home is $20,000, a 1,000-square-foot ADU would pay $10,000 under the old formula, and $2,500 under SB 1117 (only the 250 square feet over 750 count). That shows the formula. It is not an estimate for your city.

BB&K’s summary also notes some cities may need to update their fee schedules. If you apply in early 2027, ask which version your city is using.

Sample city fee ranges (dated)

To give a sense of scale, here are examples from published city and county documents. These are snapshots. Check the current schedule before you budget.

  • Menifee (Riverside County): The city posts a 2026 fee schedule covering planning and building fees.
  • San Bernardino County: The County’s ADU handout dated March 20, 2026 summarizes the process and fees for unincorporated areas.
  • San Mateo: The city maintains an ADU page with its requirements and fee information.

Across city-level schedules like these, research we reviewed put typical ADU planning and permit fee totals in a rough range of about $2,800 to $5,300, as of 2026. Treat that as a reported range, not a promise. Larger projects, school district fees, and utility charges can push totals much higher.

Fees change

When we checked, these documents were the latest we found. Cities often update fee schedules every year, usually around July 1 or January 1. Always check your city’s current schedule.

Utility costs that aren’t “fees” but surprise people

Some of the biggest surprises in ADU budgets aren’t fees at all. Homeowners on forums such as Reddit report costs like these. They are anecdotal, not official figures:

  • New gas meter: reported anywhere from about $2,000 to $40,000, depending on the utility and distance.
  • New water meter: reported around $4,000.
  • Fire sprinklers, when required: reported around $13,000.

One Santa Cruz homeowner thread on permit costs shows how widely totals vary even in one area. Your numbers depend on your utility providers, the distance to existing lines, and whether your panel or sewer line needs an upgrade.

For a fuller picture, see our California ADU cost breakdown.

Why “800 sq ft to avoid fees” advice is often misunderstood

You may see forum advice like “build under 800 square feet to avoid fees.” It mixes up two different numbers.

  • 750 square feet is the impact-fee line. At or under 750 square feet of interior livable space, an ADU is exempt from impact fees.
  • 800 square feet is a size that state law protects. Cities can’t use certain local rules to block an ADU of at least 800 square feet with four-foot side and rear setbacks, and it’s the size cap on the “by right” detached-ADU path.

So an 800-square-foot ADU may be easier to get approved, but under today’s rule it is not automatically fee-free. And no size makes a project completely fee-free. Permit, plan-check, and utility charges still apply.

After January 1, 2027, the difference between 750 and 800 shrinks for most owners. Under SB 1117, an 800-square-foot ADU would pay impact fees on only 50 square feet.

How to get your city’s real numbers

The only reliable fee number is the one your city or county gives you. Here’s how to ask:

  1. Find the right agency. City if you’re inside city limits; county if unincorporated.
  2. Download the current fee schedule and the ADU handout, if there is one. Note the date on each.
  3. Ask for an estimate in writing for your planned size. Ask which fees are impact fees, which are permit fees, and which are utility charges.
  4. Call your water, sewer, and gas or electric providers separately. Their charges usually aren’t on the city schedule.
  5. Ask about school district fees, which are often collected separately.
  6. If applying after Jan 1, 2027, ask whether the impact-fee schedule reflects SB 1117.

The free ADU planner can help you list which fees to ask your city about. You’ll find it at /adu-planner/.

What this article can't do

We can’t tell you what your project will cost or promise any project will be fee-free. Fees vary by city and change yearly. Rules vary by city — verify with your local planning department. HCD’s ADU page links to statewide resources. For process and timing, see the permit timeline guide; for the law changes, see California’s 2027 ADU law changes. More in the ADU guide hub.

Frequently asked questions

Are ADUs under 750 square feet exempt from impact fees in California?

Yes. Under current state law, an ADU with 750 sq ft or less of interior livable space is exempt from impact fees, and so is a JADU of 500 sq ft or less. Starting January 1, 2027, larger ADUs (up to two per lot) pay impact fees only on the area above 750 sq ft.

What is the SB 1117 ADU fee change?

SB 1117, effective January 1, 2027, amends Gov. Code § 66311.5 so that for lots with up to two ADUs, impact fees on an ADU over 750 sq ft are prorated only on the square footage above 750. It does not cover utility connection fees, capacity charges, or permit fees.

Should I build an 800 sq ft ADU to avoid fees?

Not for fee reasons alone. 800 sq ft is a size state law protects for approval; the impact-fee line is 750 sq ft of interior livable space. Under today’s rule an 800 sq ft ADU isn’t automatically fee-free, and after 2027 it would pay impact fees on about 50 sq ft.

What fees still apply to a small ADU?

Even an ADU under 750 sq ft can owe plan-check and building permit fees, utility connection or capacity charges, and sometimes school district fees. Costs like a new meter or sewer line aren’t fees but can be large. Ask your city and utilities for written estimates.

How do I get my city’s actual ADU fee numbers?

Find the right agency (city or county), download the current fee schedule and ADU handout, and ask for a written estimate for your planned size. Call water, sewer, and energy providers separately, ask about school fees, and after 2027 ask whether the schedule reflects SB 1117.

Sources

Primary sources