Your California ADU First-Steps Checklist
A free nonprofit checklist for starting an ADU in California: check your lot, learn the rules, budget honestly, compare quotes, and plan permits.
To start an ADU in California, work through seven steps in order: confirm who regulates your lot, pick the type of ADU that fits, learn the rules, build an honest budget, sort out financing questions, compare quotes fairly, and plan your permit path. Doing them in order helps you avoid paying for designs or bids you can’t use.
This checklist follows California state ADU law and HCD guidance. Other states’ rules differ. Even within California, your city or county applies the rules — verify each step with your local planning department.
HomeBuyers Alliance is a 501(c)(3) nonprofit. We don’t refer contractors, sell plans, or make loans. This guide is education only.
Why start with a checklist
Building an ADU (people also say granny flat, casita, or in-law unit) involves a lot of decisions, and they depend on each other. The type you choose affects cost. Your lot affects the type. Your budget affects financing. A checklist keeps you from skipping ahead — like hiring a designer before you know what your lot allows.
This checklist is free. There’s nothing to sign up for, and we don’t recommend contractors or designers. Print it, copy it, or work through it with the free ADU planner.
1. Confirm your jurisdiction and lot fit
- Find out who regulates your property. Is it a city, or unincorporated county land? This decides whose rules and fees apply.
- Look up your zoning. Many cities and counties have an online map.
- Check for special conditions: coastal zone, fire hazard area, flood zone, hillside, historic district, or an HOA.
- Find your property lines and note where existing buildings, trees, and utility lines are.
- Ask the planning department whether an ADU is possible on your lot and what they’d need to see.
See Can I build an ADU on my lot? for more.
2. Learn your type options
- Detached — a separate backyard building.
- Attached — an addition to your home.
- Conversion — a garage or other existing space.
- JADU — up to 500 sq ft inside your home.
- Combinations — in California, a JADU plus an ADU is often allowed, and starting January 1, 2027, AB 956 allows two detached ADUs on qualifying lots (chaptered bill text; BB&K secondary summary).
Compare them in Types of ADUs.
Building for an aging parent? If the ADU is for multigenerational living, add “accessibility” to your list now: step-free entry, a ground-floor bedroom and bath, and wider doors. It’s easier to plan them into the design than to add them later.
3. Know the rules (setbacks, size, permits)
California state rules; your city applies them.
- Setbacks: New detached and attached ADUs generally get side and rear setbacks of no more than 4 feet under state law. Conversions of existing structures generally don’t need new setbacks (HCD Handbook).
- Size and height: Check your city’s limits against state minimums. See our setbacks, height, and size guide.
- Parking: Many ADUs don’t require parking under state law, and garage conversions generally don’t require replacement parking.
- Owner occupancy: Generally not required for ADUs. For JADUs, it’s required only if the JADU shares a bathroom with the main home.
- Rentals: Ask about local short-term rental rules. JADU rentals must be longer than 30 days.
4. Budget honestly (costs, fees, utilities)
- List every cost piece: design, engineering, permits, impact fees, construction, utilities, fire sprinklers if required, and a contingency.
- Check impact fees. In California, starting January 1, 2027, SB 1117 allows impact fees only on square footage above 750 square feet (chaptered bill text; BB&K secondary summary). Ask your city how it applies this.
- Ask about utilities early: gas, water meter, sewer connection, and electrical panel capacity are common surprises.
- Think about ongoing costs: property taxes, insurance, and upkeep.
Use reported ranges as a starting point only. See the California ADU cost breakdown.
5. Financing questions
- Check your credit reports for errors before you apply for anything.
- Know your debt-to-income ratio.
- Learn the main options: savings, HELOC, home equity loan, cash-out refinance, renovation or construction loans.
- Don’t count on future rent to qualify. Lenders generally can’t count rent from an ADU that doesn’t exist yet.
- Don’t plan around grants without confirming they exist. The CalHFA ADU Grant is a past program; HCD says its funds are exhausted.
6. Compare quotes fairly
- Get drawings first, so every bidder prices the same project.
- Ask every bidder the same questions: What’s included? What’s excluded? What are the allowances? How are change orders priced? What’s the payment schedule?
- Check licenses on the Contractors State License Board website (California).
- Get everything in writing before you sign.
7. Plan the permit path
California state timelines (HCD Handbook):
- Completeness: Your city must tell you whether your application is complete within 15 business days of receiving it, and list anything missing.
- Decision: Your city must approve or deny a complete application within 60 days.
- Corrections: Corrections and resubmittals can add time. These deadlines are for the city’s review — not a promise of how long your whole project will take.
- Ask about pre-approved plans in your city, which may shorten review.
- Plan for inspections during construction and a final sign-off before anyone moves in.
See the ADU permit timeline guide and our pre-approved plans hub.
Use the planner to work through it
Rules vary by city — verify with your local planning department. The HCD ADU Handbook is the official guide to California state law. All of our guides live on the ADU hub.
The free ADU planner walks through these same steps with your home’s details.
Frequently asked questions
What is the first step to building an ADU in California?
Start by confirming who regulates your lot (your city or the county) and checking zoning and special conditions like HOAs, coastal or fire-hazard zones, and easements. Do this before you pay for design. It tells you which rules, fees, and review process apply, so you don’t design something your lot can’t support.
How long does it take to get an ADU approved in California?
Under state law, the city must decide whether your application is complete within 15 business days and approve or deny a complete application within 60 days. Design, corrections, and construction add time. See our ADU permit timeline guide for what the clock does and doesn’t cover.
Should I get quotes before or after drawings?
After, when possible. Drawings let every bidder price the same project, so quotes are easier to compare line by line. Early ballpark numbers can help you set a budget, but ask each provider what they include and exclude, such as design, permit fees, utilities, and site work.
How do I check a contractor’s license in California?
Look up the license on the Contractors State License Board (CSLB) website before you sign anything. Confirm the license is active, matches the business name on your contract, and covers the work. HomeBuyers Alliance doesn’t recommend or refer contractors, so this check is yours to do.
Sources
- California HCD, ADU Handbook (March 2026) — https://www.hcd.ca.gov/sites/default/files/docs/policy-and-research/adu-handbook-update.pdf
- AB 956 (2026), chaptered bill text — https://leginfo.legislature.ca.gov/faces/billTextClient.xhtml?bill_id=202520260AB956
- SB 1117 (2026), chaptered bill text — https://leginfo.legislature.ca.gov/faces/billTextClient.xhtml?bill_id=202520260SB1117
- BB&K (secondary summary), “California Further Expands State Accessory Dwelling Unit Law” — https://bbklaw.com/resources/la102226-california-further-expands-state-accessory-dwelling-unit-law